My Big Boss Part 3 Tribute (part 1)
By pkroutray
- 302 reads
My Big Boss
Part 3
Tribute (part 1)
P K Routray
While freezing the design of Damonjodi’s construction water
he instructed the consultant to take care of the needs of future.
“Why should the company spend again,
if an experienced consultant has been taken?’
Questioning the design details and factors of safety
he was perturbed that plant was being designed beyond its capacity.
“Public sectors bost of production because of over design.
EIL, AP and you all force me on a dotted line to sign”
His nonstop hammerings and close monitoring to spend less
in refinery’ unbounded quarters and unpainted structures, we witness.
( N. B-The austerity course by Big Boss.
NALCO was being built from green field at remote places. Plant before operation comes under construction phase and after operation in operating phase
- Log in to post comments